Skip to toolbar
It's going to be something...

It's going to be something...

Supported by (Turn Off)

Progress

Tutoring 6
Skill 6
Idea 8
No Comments

Progress.

Please ignore the Ancient Roman buildings to the Right and the WW2 Carentan Buildings to the left, they are both projects that have had to be put on hold for the time being, so I have room for this project.  I will get back to them possibly in the new year.

 

Anyway, moving forward.

My small army of robotic helpers have all been working 24/7 churning stuff out, so I now have almost a 4′ x 4′ basic table set up.  There is still a bit more to do, supports to go underneath to keep the raised areas, raised and a few more cobblestone tiles to finish off in places.

The idea is that each of the raised areas has three access points from the lower level, and access to the sewer system that will run around the edges of the board, and possibly into a removable section that can be taken out from under the main larger raised area for an extra element of gameplay.

The sunken road from front to back will have market stalls along its length, some of those spilling out onto the raised areas to help add an extra element of cover during use and also to blend the market across both levels.

I have to add holes for streetlights so that I can wire them in, but I’ll do that once I can get a better idea of how things will look with the buildings on.

 

Progress

A little image of part of the sewer system that will run around the edges of the board.  These will also have lighting installed in them, all being well and if time permits.  It will allow players to try to sneak around the board and pop up from the manholes along the roadways.

Progress
Progress

Leave a Reply

Supported by (Turn Off)