I did a bit of a test fit and mockup to find out where the issues are. I’ll need to do a bit of drilling and filing to clear off the accumulated paint.
Ground floor and board walk.
Interior of first floor. The back wall still needs to be painted. The stairs are in their approximate final position.
Partially assembled upper floor showing the relation of the stairs to the upper floor.