
Spring Cleaning - with an AT-AT!
The eagle has landed!
After 8 month – including a two-month break during the hottest summer months – my Star Wars Legion-scale scratch-built Lambda-class Imperial Shuttle is finished. As I claimed before – it can be displayed in both flight configuration and in landed configuration thanks to the stabilizer fins being able to rotate up and down including a simple mechanical locking mechanism for both configurations, and the two seperate landing gears which can be stuck into the underside and upon which the model is carefully balanced. Enjoy:
Leave a Reply